News   Dec 12, 2025
 604     0 
News   Dec 12, 2025
 1.5K     6 
News   Dec 12, 2025
 698     0 

Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

I’m curious….when those enormous excavations are backfilled after pouring the station structure, are all the timber and steel shoring elements removed, or are they just buried and left behind ?

Asking for a non-engineer friend.

- Paul
 
Part 2: West Median of Cedarvale station (June 25, 2021)

IMG_0803.jpg
IMG_0804.jpg
IMG_0807.jpg
IMG_0808.jpg
IMG_0809.jpg
IMG_0810.jpg
IMG_0817.jpg
IMG_0818.jpg
IMG_0819.jpg
 
What's the point in updating them? It's not like the TR's will ever run on them.

And yes, the updates would be a waste of money.
Agreed,
There's no point in doing stuff that won't serve any purpose. Hopefully they will use led monitor screens with graphics for future proofing
QOL thing. TRs will never run on Line 3, however if you ride a TR on Line 2, the LEDs for Line 3 will light up at Kennedy indicated that the stations are available at the transfer point. Same thing with Line 5, passing by Eglinton, Cedarvale, or Kennedy would light up all Line 5 stations indicating which are available to reach if you transfer at this station. Is it the most necessary feature? Probably not, but since its a pretty nifty QOL addition that was introduced with the TRs, it would be a shame to see it effectively neutered.
 
Last edited:
^In that case sure to let the TTC know how they can find the cheapest way to go about upgrading the boards. Since it's simple, easy and cheap apparently.
 

Back
Top