Toronto Downtown Data Centre | 38.5m | 4s | Equinix Inc | WZMH

It would have to be deeper than the subway and all the condo parking lots no?
Not, it would need to fit around all the existing pipes and tunnels but it does this in the area it covers now - which is filled with them. Their pipes run under streets not buildings so condo garages would not be a problem and if they had cooling pipes running under, say, Front Street it would allow lots of these buildings to hook up to it too
 

Back
Top