In November 2013, the TTC originally proposed to shift the current Line 1 platform approximately 70 m northward of its current location. Such a change would have allowed smoother flows of passenger traffic between the platforms for Lines 1 and 5, and avoided a situation where all transferring passengers are bottlenecked by only one transfer path, similar to the busy
Bloor–Yonge station. The pocket track at the north end of the station would have had to be abandoned. However, this proposal was
modified by March 2018 to shift the Line 1 platform north by only 24 m, allowing the pocket track to be retained. In the new area there will be an elevator and escalators down to the Line 5 concourse. At the south end of the platform, the elevator and stairs to the south station entrance will be retained but the platform edge will be walled off in this area.