Delayed: Traffic Signal and Street Pole Installations at Cedarvale Station - Early-May 2023

From link.

screenshot_2023-02-03_133823-_1.png


This work has been delayed and is now expected to take place in early-May 2023. Crews at Cedarvale Station will begin performing traffic signal and street pole installations on Eglinton Avenue West between Winnett Avenue and Flanders Road. To facilitate this work safely, eastbound and westbound traffic on Eglinton Avenue East will be periodically reduced to one through lane between Winnett Avenue and Flanders Road. This work is expected to take place on Monday – Friday between 10:00 a.m. and 3:00 p.m., for approximately three (3) weeks.

What to Expect
Concrete barriers, fencing, and signage will be in place to delineate the work zones. Noise from construction activities can be expected. One lane of traffic in each direction will be maintained at all times. Expect delays while traveling through the area.

HOURS OF WORK
  • As early as early-May 2023, for approximately three (3) weeks.
  • Work is expected to take place on Monday to Friday between 10:00 a.m. and 3:00 p.m.
  • Work may be rescheduled due to inclement weather and/or unforeseen circumstances.
  • This work may be longer or shorter than expected.
TRAFFIC DETAILS
  • Eastbound and westbound traffic on Eglinton Avenue East will be periodically reduced to one through lane between Winnett Avenue and Flanders Road.
  • Access to Park Hill Road and Everden Road from Eglinton Avenue West will remain restricted.
PEDESTRIAN DETAILS
  • The sidewalk on the north side of Eglinton Avenue West will remain closed between the TTC entrance and Flanders Road.
 
Eglinton West Station parking lot in 2011 (link)...

1679093263233.png



Parking Lot Construction at Cedarvale Station’s Secondary Entrance - Friday, March 17, 2023

From link.

screenshot_2023-03-17_153204_1.png


What Work is Taking Place?
As early as Friday, March 17, 2023, crews will be constructing a parking lot at the northeast corner of Eglinton Avenue West and Allen Road North, north of Cedarvale Station’s Secondary Entrance. This work involves laying and compacting fresh granular material into the ground, to construct the new parking lot. Periodic noise and vibration from construction activities can be expected. No changes to the current traffic or pedestrian routes are expected as a result of this work. This work is expected to take place between 7:00 a.m. and 5:00 p.m., for approximately two (2) weeks.​
What to Expect
Periodic noise and vibration from construction activities including, paving, grading, compacting, and concrete pours, can be expected. Concrete barriers, fencing, and signage will be in place to delineate the work zones. No changes to the current traffic or pedestrian routes are expected as a result of this work.​
HOURS OF WORK
  • As early as Friday, March 17, 2023, for approximately two (2) weeks.
  • Work is expected to take place between 7:00 a.m. and 5:00 p.m.
  • Work may be rescheduled due to inclement weather and/or unforeseen circumstances.
  • This work may be longer or shorter than expected.

Not a "new" parking lot, but on the "old" parking lot with a secondary entrance to Line 5 and Line 1 this time.
 

Updated: Final asphalt Paving on Eglinton Avenue West between Park Hill Road and Glenarden Road and on Allen Roads North and South As early as Tuesday, May 2, 2023

From link.

screenshot_2023-04-27_121922.png


screenshot_2023-04-27_122015_2.png

What Work is Taking Place?
As early as Tuesday, May 2, 2023, crews at Cedarvale Station will be performing final asphalt paving on Eglinton Avenue West between Park Hill Road and Glenarden Road and on Allen Roads North and South. To facilitate this work safely, eastbound and westbound traffic on Eglinton Avenue West reduced to one lane in each direction between Park Hill Road and Glenarden. Additionally, Allen Roads North and South will be reduced to one lane. This work will be carried out in three phases and is expected to take place on Monday – Friday between 4:00 a.m. and 6:00 p.m., for approximately five (5) days. Significant traffic changes will be in effect, please read carefully this full notice for details.​
What to Expect
Roads between Park Hill Road and Glenarden Road will have restricted access for approximately two (2) hours for the duration of the work in the immediate area. Concrete barriers, fencing, and signage will be in place to delineate the work zones. Noise and vibration from construction activity including trucks, asphalt removals, paving, and compacting can be expected. Traffic control personnel and/or a Paid Duty Officer will be present, while this work takes place. One lane of traffic in each direction will be maintained at all times on Eglinton Avenue West. Expect delays while traveling through the area.​
HOURS OF WORK
  • As early as Tuesday, May 2, 2023, for approximately five (5) days.
  • Work is expected to take place on Monday – Friday between 4:00 a.m. and 6:00 p.m. The approximate duration of each phase is listed below:
    • Phase One: This phase is expected to take place on Tuesday, May 2, 2023, for approximately 1.5 days
    • Phase Two: This phase is expected to take place on Wednesday, May 3, 2023, for approximately 1.5 days
    • Phase Three: This phase is expected to take place on Thursday, May 4, 2023, for approximately 1.5 days
  • Work may be rescheduled due to inclement weather and/or unforeseen circumstances.
  • This work may be longer or shorter than expected.
TRAFFIC DETAILS
  • Phase One: A work zone will be in place on the north side of Eglinton Avenue West between Allen Road North and Allen Road South. Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction between Park Hill Road and Glenarden Road. Traffic on Allen Road North and Allen Road South will be reduced to one lane. Access to Park Hill Road will remain restricted.
  • Phase Two: A work zone will be in place on the north side of Eglinton Avenue West between Park Hill Road and Allen Road South and between Allen Road North and Glenarden Road. Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction between Park Hill Road and Glenarden Road. Traffic on Allen Road North and Allen Road South will be reduced to one lane. Access to Park Hill Road will remain restricted.
  • Phase Three: A work zone will be in place on the south side of Eglinton Avenue West between Park Hill Road and Glenarden Road and on Park Hill Road. Eastbound and westbound traffic on Eglinton Avenue West will be reduced to one lane in each direction between Park Hill Road and Glenarden Road. Winnett Avenue, Everden Road, Strathearn Road and Flanders Road will have restricted access for approximately two (2) hours for the duration of the work in the immediate area. Periodic lane reductions will be required on Allen Road South
PEDESTRIAN DETAILS
  • Temporary pedestrian rerouting may be in effect.
  • A flag persons will be present to help direct pedestrians crossing Eglinton Avenue West.
  • The sidewalk on the north side of Eglinton Avenue West between the TTC Entrance and Flanders Road will remain restricted.
TRANSIT INFORMATION
  • Access to TTC will be maintained at all times.
 