Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

The transition between elevated line across the Humber River / Eglinton Flats, and the short tunneled section connecting to Mount Dennis station will go here.

I believe this tunnel is going to be mined to Mount Dennis station. Too short of a section to bore and no way to pull the TBMs out at the other side.
 
I believe this tunnel is going to be mined to Mount Dennis station. Too short of a section to bore and no way to pull the TBMs out at the other side.
Yup that's correct, or more technically Sequential Excavation:

 
11 and 13 Hollis Street to be torn down for a "laydown area" for the Eglinton West LRT extension's tunnel construction.

15 Hollis Street is the location for a 48 story, 583 unit condo development. So that's why 11 and 13 were not bought by Gairloch Developments. See https://urbantoronto.ca/database/projects/15-hollis.45655 . Wonder if after the construction, what will happen to the property? A park?

1725987043466.png
 
Wonder if after the construction, what will happen to the property? A park?
Read the notice in the post above yours:

The owner (Hollis Dev LP ) of 11- 23 Hollis Street has submitted a site planapproval application and a zoning by-law amendment ( 21 177934 WET 05 OZ) on June30, 2021 for a Proposed 48-storey residential building, comprising of a 6-storey basebuilding with a 42-storey tower. The building will include a total of 583 dwelling units,103 car parking spaces in three levels of underground parking, 585 bicycle parkingspaces and a gross floor area (GFA) of 39,217 square metres, resulting in a density of17.6 FSI. The applicant is progressing through the development approval process.
AFAIK Mx is just leasing the land from the developer during construction.
 
Last edited:

Back
Top