Oakville ClockWork Phase 3 at Upper Joshua Creek | ?m | 7s | Mattamy Homes | KNYMH

So CTV News wrote an article about this project: apparently when you move into new development neighbourhood, you can hear the sound of said development still under construction. 🚧 Who would have thought?!

"But he questions whether he would be able to sell or rent his home to anyone else given the state of the area and the construction which starts early each morning and goes on until the evening."

Am I supposed to feel sorry about this?

AoD
 
"But he questions whether he would be able to sell or rent his home to anyone else given the state of the area and the construction which starts early each morning soand goes on until the evening."

Am I supposed to feel sorry about this?

AoD

What makes it even worse is that one person was offered $10,000 to allow his front yard to be used by construction crews to speed the project up, and he still refused. I’m not saying you can’t negotiate, but come on.
 
When I was a kid my family was one of the first to move into a new development and our neighbourhood was a giant construction site for several years (4-5) afterwards. Yes there was sound and dust and mud and I had to walk through it all to a bus stop to get to school- but we dealt with it because it was a new neighbourhood! And the arguments about not being able to sell one‘s brand new property in a market such as the GTA due to a condition (construction) which is temporary is complete bullsheet. Do these people want to be compensated for the Canadian winter, too?
 
Two Cranes down @Paclo
IMG_3345.jpeg


The groundbreaking of Phase 3 of Clockwork condos with construction underway and the problem is couldn’t get in the phase 3 thread because of it’s locked because of do not have permission to view this page or perform this action and need to fix and unlock it. @interchange42

Here is the UT news on phase 3 groundbreaking
Mattamy Breaks Ground on Clockwork Phase 3 in Oakville
 
Two Cranes down @Paclo
View attachment 573288

The groundbreaking of Phase 3 of Clockwork condos with construction underway and the problem is couldn’t get in the phase 3 thread because of it’s locked because of do not have permission to view this page or perform this action and need to fix and unlock it. @interchange42

Here is the UT news on phase 3 groundbreaking
Mattamy Breaks Ground on Clockwork Phase 3 in Oakville
Fixed it, it's all in this thread now.

42
 
Lots of progress on these buildings since the last post. 2 cranes are up for the third building. The construction elevator on the eastern building has been taken down and external finishes on that building are almost complete. Landscaping is progressing.

Additionally, they are doing work on Dundas Street to build curb side bus pads on both sides., like they do at other stops on Dundas and Trafalgar.
 
Here is a photo of the 2 buildings with the third building's cranes from yesterday.
1000004981.jpg

The corner of Dundas and Ninth Line will have a mini skyline of 7 towers: 6 condos and a mausoleum 😅
The North side of Dundas from these buildings all the way to the Wilmot Condos at Eighth Line is zoned for up to 12 stories, residential and/or commercial, so this is just the beginning. When you enter Oakville from the east on Dundas, you will be greeted by a massive line of midrises once all the development is done.
 
Last edited:

Back
Top