Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
September 11, 2025

1000009848.jpg


1000009850.jpg


1000009851.jpg


1000009852.jpg
 
These are probably one of my favorite buildings in Toronto. Not just because of the design and height, but... is it me or they have been managing the project relatively well? Seems like it been going up pretty fast?
 
There must be a deadline approaching. Busy Saturday.
Some pictures from Friday too.

generator lift
IMG_2922.jpeg


At least two generators on the roof.
IMG_2951.jpeg


Outside window looking in. 1-2 floors per day.
IMG_2916.jpeg


New bollards
IMG_2950.jpeg


IMG_2948.jpeg


IMG_2947.jpeg


Protective wood covering being removed, final flashing. New CIBC sign.
IMG_2943.jpeg


Closing in with revolving doors.
IMG_2941.jpeg


Lone wolf
IMG_2940.jpeg


Two cooling towers gone up top.
IMG_2939.jpeg


Broken window top left?
IMG_2938.jpeg


Small future ice rink? Not worth the effort for cold feet. No skates on the nice new wood please.
IMG_2937.jpeg


Concrete pour for the Green P entrance on the Esplanade.. New bike lanes can’t be far behind.
IMG_2913.jpeg


Green roof almost completed.
IMG_2911.jpeg


IMG_2909.jpeg
 
There must be a deadline approaching. Busy Saturday.
Some pictures from Friday too.

generator lift
View attachment 682741

At least two generators on the roof.
View attachment 682731

Outside window looking in. 1-2 floors per day.
View attachment 682742

New bollards
View attachment 682732

View attachment 682733

View attachment 682734

Protective wood covering being removed, final flashing. New CIBC sign.
View attachment 682735

Closing in with revolving doors.
View attachment 682736

Lone wolf
View attachment 682737

Two cooling towers gone up top.
View attachment 682738

Broken window top left?
View attachment 682739

Small future ice rink? Not worth the effort for cold feet. No skates on the nice new wood please.
View attachment 682740

Concrete pour for the Green P entrance on the Esplanade.. New bike lanes can’t be far behind.
View attachment 682743

Green roof almost completed.
View attachment 682744

View attachment 682745
I think what looks like a pond is an extension of the grass area from phase 1
 

Back
Top