mburrrrr
Senior Member
I believe there was to be another bridge from Backstage to the TPA garage - not sure when / if that is to be built though. I imagine funding will be lined up as a bridge into Backstage with an otherwise dead end corridor would be rather silly.
I believe the corridor runs below the pool in the south end. There is a gap between the TPA garage (flat roof above car entrance) and backstage.
I'm not sure where the UP train is heading. They must be lost.