Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
There were 3 jumps in the core sometime around Nov 4, 14, 22.
This phase looks to be about 12 months behind.
81 Bay 2017-05-21 to 2019-04-05 ~ 23 months
141 Bay 2020-12-01 to 2023-11-20 ~ 35 months
The glass was ~ 6 weeks after this.

April 2019
Core jump this morning. 7 days.
IMG_8469.jpeg
 
I was wondering what the EAST end of the building will look like (@Yonge) and found this rendering
1701551477364.png

I assume the section that appears to be above the rail corridor was dropped?
 
I was wondering what the EAST end of the building will look like (@Yonge) and found this rendering
View attachment 524404
I assume the section that appears to be above the rail corridor was dropped?

I think the pleated curtain wall has been flattened in the latest plans but the massing is the same.
 

Back
Top