Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
P1210974.jpg


P1210977.jpg


P1210979.jpg


P1210984.jpg


P1210987.jpg


Landscaping / sidewalk forming ...

P1210991.jpg


What appeared to be a section of a large vertical art piece in the north part of the lobby area...visible above the lobby hoarding near west entrance to terminal.

P1210988.jpg


Tower needs a good scrub, but otherwise looking good.

P1210992.jpg


P1220001.jpg


P1210983.jpg
 
So what's the route for buses that want to go Eastbound?

West on Lakeshore, south on York, east on Harbour, north on Bay, then up the ramp to EB Gardiner?
I saw a GO bus on a video coming from eastbound Harbour that turned onto Bay northbound then got onto EB Gardiner ramp.
 
This question has been asked and answered again and again in several forms in this thread over the last while. Asking yet again is practically admitting that you do not do any looking back over the thread before posting questions. If you're going to post
In the top photos up above it looks like they're showing lime coloured backhoe etc. dismantling the GO bus station? If so does anyone know if they're prepping it for the second phase development ?
 
In the top photos up above it looks like they're showing lime coloured backhoe etc. dismantling the GO bus station? If so does anyone know if they're prepping it for the second phase development ?
The (former) GO bus station is no more; yesterday all that was left was the westerly building with the elevator to Platform 3. The announced plans are for excavation to start in early 2021. See Post 6230 one page back for announcement/
 
I assume that is the plan unless the USA falls into civil war taking the rest of the world into turmoil:eek:
Even if it does fall into a civil war, it will unlikely have any bearing on phase 2 being developed. If it tries to re-enact the War of 1812 though, it might be more of an impediment on this project...
 
Should there be separate blog for the second tower starting with the information on the previous page ? Now that it's about to commence in two months!
 
Widen the sidewalk on the right (next to Scotiabank Arena) 10 feet, plant a row of trees between the road and the sidewalk, and this 1 block stretch will start reaching its potential. Better yet, extend the widened sidewalk (and trees) south under the Gardiner all the way to Queens Quay.
 
In the top photos up above it looks like they're showing lime coloured backhoe etc. dismantling the GO bus station? If so does anyone know if they're prepping it for the second phase development ?
The full warning would not fit in your post, so here goes:

This question has been asked and answered again and again in several forms in this thread over the last while. Asking yet again is practically admitting that you do not do any looking back over the thread before posting questions. If you're going to post a question, read the last few paves of the thread first to see of the answer is already there. Your behaviour is tantamount to trolling at this point, and that can have consequences for you.

42
 