Toronto Cherry House at Canary Landing | 50.32m | 13s | Dream | COBE Architects

20250830_164330.jpg
20250830_164506.jpg
 
It used to be rather crappy regular City sidewalk.

View attachment 678833

Based on what one of the crew told me, they tore all that up, then put cement down, then realized that they were going to put trees and interlocking, so it all had to be torn up again. So, they waited until the construction elevator(s) came down to start ripping it all up (again).
 
I’m still waiting for an actual Shoppers coming soon! Sign to go up before I fully start believing. But I did walk in Front the other day and felt the Northwest retail space had much higher ceilings that would work for a Shoppers. Surprised to hear (maybe not geographically) that the Shoppers would be in the smaller looking space on the east side.
 
Also noticed that some of these panels have more blades than others here and there...
...I'm guessing this was done with playing on reflecting light in mind, for good or bad.
 

Back
Top