ProjectEnd
Superstar
Almost done? My guess would be that it's 9 months to a year from now to occupancy.
This one is starting to pleasantly surprise me.
I'm going to stick my neck out here like I did for Sugar Wharf and say that this cladding is going to be better than most people are expecting. The variable width and length opaque sections of the balcony cladding are going to give us a nicely chaotic look to juxtapose against the more rigorous geometries of the surrounding buildings. In a sea of sameness, this will be the kid with freckles and a gap-toothed grin whose face might not be classically beautiful, but will stand out as some badly needed and appreciated character and variation.
42
So… if I liked the "variable width and length opaque sections of the balcony cladding" before, now that there's more of it, I'm supposed to like that less? Anyway, It's still not done, so why ask now? To be provocative before we get a look at the full design played out? I rarely weight in on a design mid-construction, but I did this time, and am able to apply my imagination to the face of a while building without the construction elements there still, and I cannot see why having more of something I liked before would make me like this less now.How are you feeling about it now?
I must confess, it's not growing on me.
So… if I liked the "variable width and length opaque sections of the balcony cladding" before, now that there's more of it, I'm supposed to like that less? Anyway, It's still not done, so why ask now? To be provocative before we get a look at the full design played out? I rarely weight in on a design mid-construction, but I did this time, and am able to apply my imagination to the face of a while building without the construction elements there still, and I cannot see why having more of something I liked before would make me like this less now.
42