jaborandi
Active Member
I don't think the supporting columns will be that wide, only the footings for the support columns. There sure is a lot of water down there. This morning they were spewing big chunks of gravel down below to be used as filler but somehow the flow got out of control and there was gravel landing everywhere. Don't know why they didn't just put it into the big bucket and lower it by crane.
Just did another check at lunch and the rebar(s?) are in place in the pits at the south end and one can clearly see the width of the support columns. The gravel crisis seems to have been cleaned up and tempers and hand gestures are under control.
Just did another check at lunch and the rebar(s?) are in place in the pits at the south end and one can clearly see the width of the support columns. The gravel crisis seems to have been cleaned up and tempers and hand gestures are under control.