A box culvert for storm water, being installed to replace the old system. The Brightwater site will tie into this system which lies of to the side of the very south end of Mississauga Road.
Where the culvert meets the Lake, temporarily closed off.
Thanks for the great picture update! Looks like it’s progressing well. Do you think the chance of Phase 1 being done by May 2023 being very possible at this point?
December 17th
So what had been four cranes on premises (including one for the Mason) I see has been reduced to three after the blue and red one closest to Lakeshore was removed since my last visit November 6th. Additionally, the roads have been paved, including the western side townhouses.
That's a lot of conduit. I wonder if they ever miss one or two after the floor is poured.