Toronto Bloor-Lansdowne GO Station | 6.77m | 1s | Metrolinx | Brown + Storey

ProjectEnd

Superstar
Member Bio
Joined
May 28, 2007
Messages
16,814
Reaction score
52,652
I'm genuinely not sure how to correctly title this thread (in that vein, we should probably get consistent about it, some have Metrolinx, others have GO, others have nothing...), but I wanted to put everything about this project in one place as it's currently all sitting in the vast GO Construction Projects thread.

Bloor-Lansdowne.jpg


GBzO4p2WUAAKBWM.jpeg


GBzOFBxWIAAlfh5.jpeg


GBzOGTYWIAEvaRZ.jpeg


Screen Shot 2022-08-10 at 10.22.02.png


44101-130395.jpg
 
There is no justification at all for planning for blank concrete walls in the underpass; they will be taggers heaven and endlessly repainted, to particular effect.

Either plan for a mural; or use texture/forms of quality to discourage tagging.
 
Last edited:
Also, we are back to shelters, not full platform canopies.
The cheapening. Also surprising as Metrolinx has been building canopies at all of their new stations lately, even low-use stations like Old Elm up north of Stouffville have been getting them. I wonder if it was the city doing some cost cutting on that front. In fact, I almost guarantee it was the city..
 
The cheapening. Also surprising as Metrolinx has been building canopies at all of their new stations lately, even low-use stations like Old Elm up north of Stouffville have been getting them. I wonder if it was the city doing some cost cutting on that front. In fact, I almost guarantee it was the city..

i would also prefer canopy coverage; that said; Metrolinx is coming in with project cost inflation numbers on multiple projects that exceed what we are seeing in the private market.

Smart Track Stations is one of those project sets; so is the West Toronto Rail path which Mx is delivering.

Something is very wrong. Construction costs are up for everyone; but they're up more for Mx....... the answer is not 'VE'ing' the answer is figuring out what's going wrong in procurement/tendering and fixing it.
 

1325 BLOOR ST W & 17 DORA AVE​

This site plan control application is for the propossed Bloor Lansdowne Smart Track GO Station, which consists of the main station building, platforms, and Maintenance Building located at the south end of the platforms at Dora Avenue. Cross-Reference 1319 Bloor Street West - Site Plan Control Application 21 205938 STE 09 SA


1734378655492.png


1734378677044.png


1734378707540.png


1734378570906.png


1734378367471.png


1734378389827.png



1734378728347.png
 
The design looks rather modest, so one must question that eye-watering cost...
I believe a report from UoT came out stating that most of the cost escalation in Ontario come from government permits and the excessive use of 3rd party consultants for design, engineering, and consultations with the public.
 
Go stations should be prefabricated if they're going to copy the design for every station. And if they're prefabricated buildings, it should be a lot cheaper
 

Back
Top