Toronto 580 King West | 41.83m | 9s | Constantine | AUDAX

City Council voted today to send representation to the LPAT to support the settlement proposal..

42
 
Zoning was settled at the OLT in 2021, and this is now working through the SPA process with resubmissions in 2022, 2023 and April 2024:

DIALOG is now attached as AoR, AUDAX remains Design Architect.

Updated renderings:
PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (1)-0.jpg

PLN - Architectural Plans - 2of4 - Architectural Plans (2 of 4)_578-580_King St W-4.jpg

PLN - Architectural Plans - 2of4 - Architectural Plans (2 of 4)_578-580_King St W-6.jpg


Perspective drawings:
PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (1)-06 - Copy.jpg

PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (1)-06.jpg

PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (2)-06 - Copy.jpg

PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (3)-06 - Copy.jpg

PLN - Architectural Plans - 1of4 - Architectural Plans (1 of 4)_578-580_King St W (1)-10.jpg

PLN - Architectural Plans - 3of4 - Architectural Plans (3 of 4)_578-580_King St W-1.jpg
 
I doubt this is still happening though is it ? This was office space no ?
 
Signs of life here with a Dec 2025 resubmission:



578-580 KING ST W


To alter the redevelopment plan for a 9-storey office building approved under Site Specific By-law 718-2025 (OLT) by permitting a change of use from office to hotel use, increasing the number of storeys to 10 storeys (with a total height of 43.39 m), and increasing the maximum permitted non-residential gross floor area for this lot. This site has heritage designation.

580k2.jpg

580k.jpg
 