Toronto 57 Brock | 24.69m | 7s | Block | RAW Design

20230803_192634.jpg
20230803_192700.jpg
20230803_192718.jpg
 
Likely the same as others, just had my occupancy pushed back again to October 4th. Hopefully this is the last time...
 
Might be a good thing. I'm hearing occupancy fees (other projects) are much higher than usual with the high interest rates.
 
Saw my unit as well as several other units en route to 4th floor. October seems...feasible...but quite a few units still down to the studs. Honestly am very happy with how it's turning out just very slow
 

Back
Top