BobBob
Senior Member
What is that warehouse that is being swallowed? Is that a new structure as well?
Knowing the Sorbara s-l-o-w-n-e-s-s a more realistic occupancy date should be December 2012.
Knowing the Sorbara s-l-o-w-n-e-s-s
Being the nosy neighbour, I went to the preview last night.
Occupany stated as December 2010.
Some nice design features:
- white reflective roofing
- grey water recycling/storage for the front courtyard
- full-size french balcony doors on many suites (some have 5 or 6 in one suite!) of the front podium
- every one of the 102 suites has a balcony
- every one of the 102 suites has parking available
Any word on pricing?