Toronto 310 Front West | 225.4m | 70s | H&R REIT | Hariri Pontarini

Is this project on hold or cancelled? My employer is moving back to this building after vacating its floors in 2024.
What was the last building H&R built (not Lantower, H&R)?
330 front St has been fully evacuated and they have demolition teams tearing out all the wiring and interior.
That seems odd (not doubting you, but...) given H&R has no plans to replace it in the near or long term. Why lose an income-producing asset unless there's some horrendous and costly replacement issue (they date from 1989 by which time things like asbestos had already been largely phased out).
 
330 front St has been fully evacuated and they have demolition teams tearing out all the wiring and interior.
What was the last building H&R built (not Lantower, H&R)?

That seems odd (not doubting you, but...) given H&R has no plans to replace it in the near or long term. Why lose an income-producing asset unless there's some horrendous and costly replacement issue (they date from 1989 by which time things like asbestos had already been largely phased out).

Without judgement.............. I offer that there are no permits applied for or out on 330 Front St W.

And nothing current on the other two buildings, the most recent is '23 and it was a very minor mechanical (Add condensate pipe at 320)
 
Last edited:
Without judgement.............. I offer that there are no permits applies for or out on 330 Front St W.

And nothing current on the other two buildings, the most recent is '23 and it was a very minor mechanical (Add condensate pipe at 320)
You can get away with a lot of interior demo without a permit, but yeah, it's very odd...
 