Automation Gallery
Superstar
Great Looking,Makes me wonder why this building was downsized,the original height was to be aprox 190 meters which would have made it really stand out.
Seems like every proposed tower height in Toronto is rejected by the city.On
approval they are usually reduced from 5-10 storeys.
Seems like every proposed tower height in Toronto is rejected by the city.On
approval they are usually reduced from 5-10 storeys.