Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

IMG_7145.jpeg
 
Saturday, and another long day at the 160 Front Street construction site. At 7:20 this evening, the crane, which had been working all day, was still operating.

I guess they were lifting the Building Maintenance Unit in place.
Pictures from today, Sunday.

3E4CCF4B-3BE7-4471-AD25-4B87B650AC21.jpeg


76557406-40F7-4E92-B7FE-8D18042B7359.jpeg


D5980E35-20D1-4B49-8A23-BD53AB7A6D22.jpeg


4AD57ADD-5073-43F4-AD5F-109077294224.jpeg


F7F66CB9-6743-450E-8C22-69FC070D13B9.jpeg


From April 16. The BMU base was in place and I just like the lighting/reflection on the south face contrasting with the east.
DE38CB11-DBE3-41DF-9C2E-BCE47749CBAE.jpeg
 

Attachments

  • 02CA27C3-0369-4DAF-8BBE-3E03287225D9.jpeg
    02CA27C3-0369-4DAF-8BBE-3E03287225D9.jpeg
    232.8 KB · Views: 90
I don't know if it's just me but 3 weeks ago this thing seemed it was going to be finished by now...lol.
 

Back
Top