Toronto 1375 Queen West | 35.46m | 10s | Skale | Giannone Petricone

I think that this may be very significant as it is the first Main Street redevelopment to get going in Parkdale.
 
May 1st.
1000019555.jpg
 
I think you're right because I was visiting Lumicrest next door a couple of weeks ago and the smell of gas in the air was thick.

Has the site ever been remediated? I wonder if that's what we're looking at as opposed to the start of construction of the building.

***

Has to be............ this one doesn't have NOAC yet.

Also the C of A application was postponed.
 
Soooo thrilled this one is finally starting

Uhh, not exactly.......

1725161528298.png


The above is the only permit issued, or applied for here.......

I may have wondered aloud about this previously:

****

Has the site ever been remediated? I wonder if that's what we're looking at as opposed to the start of construction of the building.

***

Has to be............ this one doesn't have NOAC yet.

Also the C of A application was postponed.

@Paclo will wish to make note, that since my post above, the C of A decision has been issued and approval was granted.
 
From new Oct 2024 docs:


Proposed changes from the Minor Variance are as follows:
  • Storeys increased from 8 to 10 (inclusive of indoor amenity in the mech level)
  • Height increased from 30.6 to 35.22m
  • Underground levels reduced from 2 to 1
  • Total residential units increased from 47 to 62
  • Vehicular parking eliminated from a previous 15 spots to 0
  • Total bicycle parking increased from 62 to 82
No building permits have been applied for since the remedial work permit was issued in May.
 