How long has this project been going on for? Feels like 10 years.
How long has this project been going on for? Feels like 10 years.
There was an earlier project around 2015 that dealt with the entrances, track along Eastern, and Connaught. As far as I know, that's not being touched now.How long has this project been going on for? Feels like 10 years.
Is actually an expansion of the yard or are the tracks just being rebuilt?
This year will see the completion of rebuilding of the existing yard. The next phase, 2026-28 or about will see the building of the 2 tracks carhouse beside the existing one to deal with the overhead of the new fleet like the one that was done as Roncesvalles carhouse some years ago.Is actually an expansion of the yard or are the tracks just being rebuilt?
There been changes made to the complex the last 10 year or so starting with trackwork on Eastern along with rebuilding the west sound barrier wall with new tall steel columns to support the future overhead OS system. I believe some interior work was also done to the existing carhouse. Construction of the yard got underway in Q1/Q2 of 2023.There was an earlier project around 2015 that dealt with the entrances, track along Eastern, and Connaught. As far as I know, that's not being touched now.
This project is far more significant - and hasn't been going that long.
That has been the plan from day one, but no it not for a number of systems.Do the yard tracks have to be fully embedded in concrete?
Looks like single point as TTC doesn't think yards need double point.Single-point track switches or double-point track switches at Russell?
The "mainline" rail on Queen was last replaced in 2013. Thus, it still has a fair amount of life left. If the points are banging, a crew will go out and adjust them.Talk about switches, I fail to note that the switches to/from the yard off Queen need replacing as drivers are really going slow through them that are in the same direction and hear a chunking nose more so this year than in the past. It is bad enough having to come to a stop for switches against you that should have been replaced decades ago as they were rebuilt. Don't know if TTC is planning on replacing these swithes anytime soon.