junctionist
Senior Member
If they linked Hamilton with a high-speed line, they could extend it to Niagara Falls. It could also mean less congestion on the QEW.
Why not just expand Buttonville?
Two new freeways are proposed connecting the 407 to the 401 in Durham Region. They'll be built along with the 407 extension to the 115 - the EA is going on now. A new rail link to the city is part of the Pickering airport proposal too, mostly using existing corridors.I wonder what transportation links the Pickering airport would require? Presumably, it would need a 400-series highway to connect it to the 401 (realizing that the site is next to the 407).
for anyone who lives east of Yonge Street, Hamilton is not going to be a very attractive option.