MetroMan
Senior Member
Thanks DSC. Both of these are great news. Despite a rise in cost, Rob Ford's gravy train seeking fingers stayed out of the project.
The restaurant will help attenuate the break of retail East of University. A restaurant or other permanent retail in the space at the base of the Four Seasons Centre would help as well. Also, I recall that the Sheraton Centre is planning to reconfigure their lobby layout to open up to Queen St. This would complete the trifecta to help end the cold black hole between University and Bay.
The Archer was discussed earlier in the thread. I personally feel that it would be better suited for the new sculpture garden on the West end of the site. In its current location, it ends up in an awkward place because of the addition of the new stage. Hopefully this is where it's going. Churchill is moving and perhaps we'll get a few more new ones for the new garden.
Worth mentioning, the walkways are absent from the work to be completed this year. They're planned to be decked with wood flooring and cuts on the floor and walls to open views to below and into the square. Given that the restaurant will connect to the walkways, it's possible that this work will be completed in 2013 along with the restaurant construction.
The restaurant will help attenuate the break of retail East of University. A restaurant or other permanent retail in the space at the base of the Four Seasons Centre would help as well. Also, I recall that the Sheraton Centre is planning to reconfigure their lobby layout to open up to Queen St. This would complete the trifecta to help end the cold black hole between University and Bay.
The Archer was discussed earlier in the thread. I personally feel that it would be better suited for the new sculpture garden on the West end of the site. In its current location, it ends up in an awkward place because of the addition of the new stage. Hopefully this is where it's going. Churchill is moving and perhaps we'll get a few more new ones for the new garden.
Worth mentioning, the walkways are absent from the work to be completed this year. They're planned to be decked with wood flooring and cuts on the floor and walls to open views to below and into the square. Given that the restaurant will connect to the walkways, it's possible that this work will be completed in 2013 along with the restaurant construction.
Last edited: