enter username
Active Member
I'm making this thread to share a map + database of missing curb cuts in Toronto and effective strategies to correct them.
The background is there's a lot of trails and walkways that have 10 cm+ curb drop-offs where they meet roads - barriers to cycling and wheeling in general. In the cycle infrastructure thread, it was thought this might be liability or bureaucracy related and a few ideas were floated around for how to fix them. I found 2000 examples of these barriers on google maps, and gave a score based on 10 variables I thought may be used to argue for or against allowing a curb cut (such as road class, nearby curb cuts, proximity to intersections, etc). None of these variables seem to be a deal breaker individually, as I found examples of existing curb cuts in every situation.

Early July I submitted 311 "Adjust curb height" request 03222854 for a highly ranked spot on Fairfax Cres that now has a bike share, but 2 months later no word
I can foresee adding cement may cause plowing or drainage issues on busy streets, but have seen it done in an official context in low income areas like Craighton Dr at Rannock St (covered in snow on street view).
Anyone can feel free to use the database or map for whatever, and I look forward to reading any ideas
The background is there's a lot of trails and walkways that have 10 cm+ curb drop-offs where they meet roads - barriers to cycling and wheeling in general. In the cycle infrastructure thread, it was thought this might be liability or bureaucracy related and a few ideas were floated around for how to fix them. I found 2000 examples of these barriers on google maps, and gave a score based on 10 variables I thought may be used to argue for or against allowing a curb cut (such as road class, nearby curb cuts, proximity to intersections, etc). None of these variables seem to be a deal breaker individually, as I found examples of existing curb cuts in every situation.
Early July I submitted 311 "Adjust curb height" request 03222854 for a highly ranked spot on Fairfax Cres that now has a bike share, but 2 months later no word
I can foresee adding cement may cause plowing or drainage issues on busy streets, but have seen it done in an official context in low income areas like Craighton Dr at Rannock St (covered in snow on street view).
Anyone can feel free to use the database or map for whatever, and I look forward to reading any ideas
Last edited:




