Northern Light
Superstar
Subject to budget approval, this is a highlight from the analyst notes about the Transportation Services Capital plan
Full Plan can be read here: http://www.toronto.ca/budget2013/pdf/cap13_an_transportation.pdf
The plan does not include the details on smaller projects which are merely grouped as 'resurfacing' , 'reconstruction' and the like.
Major items are broken out, as listed below ($ totals reflect total project cost to completion over up to 10 years):
Previously Approved
Front Street Reconfiguration -
EA & Streetscape
Improvements
$4,400.000
****
F.G. Gardiner Expressway
$505,160,000
Major Roads Reconstruction &
Resurfacing
$654,729,000
Lawrence Allen Revitalization
Project (Phase 1)
$6,274,000
St. Clair West / Metrolinx
Grade Separation
$32,000,000 (under pass widening just east of Keele)
Steeles Widenings (Tapscott -
Beare)
$38,000,000
Legion Road Extension & Grade
Separation
$45,000,000
Also worth highlighting:
Cycling infrastructure 2013 budget: $11,680,000
North Yonge Centre (North York D/T ring road) 2013: $10,000,000
Six Points Interchange Redevelopment shows up as 2015-2018 at a budget of: $40,548,000
Full Plan can be read here: http://www.toronto.ca/budget2013/pdf/cap13_an_transportation.pdf
The plan does not include the details on smaller projects which are merely grouped as 'resurfacing' , 'reconstruction' and the like.
Major items are broken out, as listed below ($ totals reflect total project cost to completion over up to 10 years):
Previously Approved
Front Street Reconfiguration -
EA & Streetscape
Improvements
$4,400.000
****
F.G. Gardiner Expressway
$505,160,000
Major Roads Reconstruction &
Resurfacing
$654,729,000
Lawrence Allen Revitalization
Project (Phase 1)
$6,274,000
St. Clair West / Metrolinx
Grade Separation
$32,000,000 (under pass widening just east of Keele)
Steeles Widenings (Tapscott -
Beare)
$38,000,000
Legion Road Extension & Grade
Separation
$45,000,000
Also worth highlighting:
Cycling infrastructure 2013 budget: $11,680,000
North Yonge Centre (North York D/T ring road) 2013: $10,000,000
Six Points Interchange Redevelopment shows up as 2015-2018 at a budget of: $40,548,000