Johnny Au
Senior Member
Per this post in the TTC: Flexity Streetcars Testing & Delivery (Bombardier) thread: #7776
The Urban Toronto Wiki would allow members to be able to edit information on the fly. For example, if a proposed building's height were to change suddenly, a member could change it to the correct height. Dates a streetcar is delivered can be added in as well, along with the status of tunnel boring machines under Eglinton.
To prevent vandalism, every edit would have to be approved by a mod or admin.
The Urban Toronto Wiki would allow members to be able to edit information on the fly. For example, if a proposed building's height were to change suddenly, a member could change it to the correct height. Dates a streetcar is delivered can be added in as well, along with the status of tunnel boring machines under Eglinton.
To prevent vandalism, every edit would have to be approved by a mod or admin.