robmausser
Senior Member
Can the platforms fit 14 cars though?
I believe a lot can fit 13 if the loco goes past the end of the platform. But it would require some more precision stopping.
Can the platforms fit 14 cars though?
It doesn't scale that well. Mature bike cultures don't allow bikes on trains. Not to say we shouldn't allow it, just that high quality parking at stations and bike share options would likely have a bigger impact.I mean I would like a bike car on every go train that's not 12 car, but I know that's a lot to ask for.
You could put a 13th bike car train on trains with the new MPI locomotives since they can pull 14 cars.
I really think bikes on GO would benefit ridership, it solves the last mile problem of a lot of stations and once you get downtown.
NoCan the platforms fit 14 cars though?
Maybe they could convert the refurbished old cab cars to allow for bike accessibility?The GO fleet has 979 coaches, GO could easily convert 10 regular coaches to bike cars and it wouldn’t make a dent in the fleet.
It doesn't scale that well. Mature bike cultures don't allow bikes on trains. Not to say we shouldn't allow it, just that high quality parking at stations and bike share options would likely have a bigger impact.
I think this is a smart compromise. For the people bringing their nice bikes for a long cruise around Niagara this is worthwhile. For the people who just want a bike for the last mile in Niagara Falls, a bikeshare system would be a much better option (provided there are decent cycling facilities). I can see an argument for Metrolinx getting into the bikeshare business (perhaps uploading it from TPA) so that much of the regional transit system can have bike share/bike rental at stations like OVFiets. The Dutch build some crazy big bike garages, but don't seem to have an equivalent of very short term bike rentals like bike share. OVFiets is good, but it meant for daily, return trip use, not one way. It could cut down on the bike parking clutter if there were just ubiquitous bike rentals, and instead of garages have repositioning infrastructure.In the Netherlands, it costs 10 euros to bring a bike on a local or intercity train. That tells you something.
From what I understand this line’s issue is not bike culture so much as bike business. Delivery riders. If delivery companies provided their riders with guaranteed bikes in their areas of operation, no problem, but that isn’t their business model. Neither is paying riders enough to live in the downtown Toronto delivery areasIt doesn't scale that well. Mature bike cultures don't allow bikes on trains. Not to say we shouldn't allow it, just that high quality parking at stations and bike share options would likely have a bigger impact.
“likely”. Why not show your work, bearing in mind that while CN might sell the Guelph sub, selling the Halton would be another matter entirely, and thus a cap would exist on movements onto and off the Guelph anyway.I've thought about this in a previous post, but I wonder if this might present an opportunity to look into completely decoupling freight and passenger operations in the GTA.
For example, with this conflict, it could be worth looking into eliminating freight traffic on the Guelph Sub entirely by buying out CN and the GEXR. Most of the lines CN sold to Metrolinx are secondary and it is likely not interested in long term continued operations. I don't believe G&W is interested in long term operation of the GEXR either given the loss of the Guelph Sub.
Doing so could simplify design requirements and speed up the implementation of electrification and high frequency service.
While there would be the negative impacts of a mode shift to trucks, it would likely be more than made up for by the decrease in car traffic and other resulting benefits.
The issue is not the size of the fleet vis-a-vis the number of bike coaches. The issue is the size of each of the trains and the loads they are expected to carry.The GO fleet has 979 coaches, GO could easily convert 10 regular coaches to bike cars and it wouldn’t make a dent in the fleet.
Pre-COVID, Metrolinx had designed their train cycling model quite particularly, and had sized each train accordingly. If a particular trainset was 12 cars long, it's because it needed to be during the morning and afternoon rush hours.
There's no reason to believe that they've gone away from this. There are a lot of 10-car trains in service, but there are also a lot of 12-car trains. 10-car trains could in theory be extended to 12-car trains with 2 bike coaches, but the 12-car trains can't be extended any more than they already have been.
Well......yes and no.The tweets above that triggered the discussion were about service on a Sunday, however. Plenty of room to allow bikes if the train size is adjusted.
- Paul
So if a 10-car train is to be used on a weekend, it will have to be from a set that is 10-cars during the week. And that might mean bring trains in from Georgetown, instead of from Willowbrook.
Well......yes and no.
Since well before Metrolinx was ever a gleam in any politician's eye, GO has been quite allergic to changing train sizes. They would only do it if they absolutely needed to - and under no circumstances would they do so just to satisfy a one- or two-day need.
(I will add the caveat that they did for a while with the bike trains to Niagara Falls, but even then they would do some funny tricks like putting together a 6-car sub-set of equipment that they would then remove from a train and leave aside for the entirety of the work week. But towards the end of pre-COVID they were going way from this model too, and had just set aside full 10- and 12-car trainsets of equipment in the yard for the week.)
So if a 10-car train is to be used on a weekend, it will have to be from a set that is 10-cars during the week. And that might mean bring trains in from Georgetown, instead of from Willowbrook.
Dan
Timetable 31 indicates that all weekend services on the Kitchener line (Mt Pleasant to Union) are delivered using the two trains stored overnight in the Georgetown layover.So based on this, for the Kitchener Line weekend service, it will be easier once the Heritage Road layover is open to have 10-coach or 12-coach weekend trains for the line?