Krypto98
Active Member
Are you sure about that? Major upgrades would need to be done to the Fergus spur... at the current moment it's single track R105 territory with 10/15 mph maximum speed. And per some old ETTs the maximum speed was 20-30 mph with OCS (dark territory mainline)With the Galt Sub being part of CP‘s Toronto-Chicago spine, it would be terribly expensive to extend the Milton line to Cambridge, with basically no major settlement en-route. Much better to build a branch from the Kitchener Corridor by reactivating the Fergus Sub from Guelph, which allows separate stops at Hespeler, Preston and near Cambridges bus terminal…
At the current moment the Galt sub from Guelph Junction westward is single track ABS which is OCS with intermediate block signals.
It probably depends more on which option has more long term benefits than short term.