Both CN and CP have rejected electrification of their line due to Double stack cars and other things.
Maybe they should setup a test area of many KM to see what issue there maybe and how to fix it or deal with it.
If other counties around the world can do testing and then set the standards for the system why not in NA??
The big different between the world and NA, we run long trains over a 100 cars while most systems in Europe only see 40 cars, but testing longer trains at this time. Then, passenger service is top dog in Europe compare the opposite in NA.
End of the day, time to electrification all lines until another power source that clean comes along.
Indian Railways starts double-stack electric operation