crs1026
Superstar
Another edition of Metrolinx being short-sighted clowns. Not building a four track wide Etobicoke Creek bridge today is just going to force us to build a more expensive bridge tomorrow. That or build a single track bridge, either way, costs will inevitably escalate in the future.
I don't know that this is fair. While many of us may feel that adding a fourth track to LSW is desirable (or even essential), it's a major project that ML has never really articulated any intention to pursue, or even plan. And I'm not sure that this particular bridge reconstruction is all that much of an opportunity, it's more a replace-in-kind than an enlargement task.
If they try to do everything at once, nothing will get done.
Putting money into one bridge, when the fourth track demands a whole number of other things things (eg multiple grade separations) that won't get done for a while, may not be the best use of the 2025 budget.Something elsewon't get done, and that puts other goals at risk.
Even if this one new bridge span coats more down the road, the campaign to do the fourth track may work better as a package.
-Paul