reaperexpress
Senior Member
The brief discontinuities without switches are just places where the temporary route shifts from the east track to the west currently. Those spots will be realigned and reconnected so there will just be two continuous tracks without a switch at that location. That type of track shift can be completed in a day, as we saw on LSE last weekend.While double track has been laid between Unionville and Kennedy (minus this bridge) I notice that there are a lot of stop/starts of the tracks where they aren’t connected (not even by a switch). There’s still missing track for short segments around Milliken station.
There will have to be some clean up of the track to connect everything before it’s formally double tracked between Unionville and Kennedy.
Last edited:




