The way the Eglinton line is going, they have a fighting chance of opening Caledonia GO and Line 5 at the same time!Caledonia station starting construction in Q4... I want to believe it.
The way the Eglinton line is going, they have a fighting chance of opening Caledonia GO and Line 5 at the same time!Caledonia station starting construction in Q4... I want to believe it.
I figure with Stouffville and Kitchener line progress where they are we could see half hourly through running service concurrently with Eglinton opening which would be really nice.Thanks for sharing. I'm glad there was an update on Stouffville construction and hopefully evening service will be restored by next summer.
I figure with Stouffville and Kitchener line progress where they are we could see half hourly through running service concurrently with Eglinton opening which would be really nice.
Agree generally, but I’m pretty sure half hourly to Bramalea is possible today on the existing infrastructure.We won't see half hourly on the Kitchener line, even east of Georgetown, until the third track through Brampton is completed. That project is still only in procurement. Maybe the Silver flyover is needed also.
Surely Crosstown will happen sooner than that !
- Paul
CTC isn't active yet between Humberview and Nickle on the 4th track, but if it was it definitely should be feasible to do every 30 minutes to Bramalea.Agree generally, but I’m pretty sure half hourly to Bramalea is possible today on the existing infrastructure.
CTC isn't active yet between Humberview and Nickle on the 4th track, but if it was it definitely should be feasible to do every 30 minutes to Bramalea.
Metrolinx has indicated to City staff that OnCorr schedules will be made available in Q1 2024