drum118
Superstar
April 20
The word is that the work will start on Burloak grade separation beginning June
Agincourt Station
This station is 98% complete with access to the east platform from the west platform along with working elevators. Both platforms can be access from the new Sheppard stairs. You cannot walk the full walkway for the east platform as it blocked off at both elevators.
Fencing has been installed next to the rail corridor at both ends and both platform to stop the public gaining access to the corridor with the fence only about 4' high and black.
Still some work to be done with a small crew on site.
Until the bridge to the south is built, the east track can't be gravel and align.
Milliken Station
The station is 90-95% complete to the point the east platform is ready for service. Once the east platform is in service, track for the west platform can be gravel and align as well installing all the screens on the platform.
Taller fencing has been installed on the rear of both platform with no access to the east or west platform other than the new Steeles entrances or the station parking lot.
Work is still underway getting the Steeles stairs and elevators into service as well the walkway bridges over Steeles.
Both stations parking lots were nearly full where it not block off for construction work or material. A huge jump from the last time I had a looked at the stations this year.
Kennedy Station
This station is only 50% complete considering service was moved to the east platform on April 8 with the the east needing most of the work done on it. The west platform stills needs work like it has needed the last 2 years to complete it.
Trains locomotive stop on the north side of Eglinton overpass that is next to the Crosstown Station entrance. Lots of work to be done for that entrance with the saying Q1 2024 opening date.
Bike rack storage is at the north end under the overpass.
The only elevator out of the 3 location that has a partly built one in it is at the south end of the east platform. There are 2 ramps to the east platform where the elevators are to be, Small crew on site and most of the work must be done overnight and weekend.
Photos to follow at a later date
The word is that the work will start on Burloak grade separation beginning June
Agincourt Station
This station is 98% complete with access to the east platform from the west platform along with working elevators. Both platforms can be access from the new Sheppard stairs. You cannot walk the full walkway for the east platform as it blocked off at both elevators.
Fencing has been installed next to the rail corridor at both ends and both platform to stop the public gaining access to the corridor with the fence only about 4' high and black.
Still some work to be done with a small crew on site.
Until the bridge to the south is built, the east track can't be gravel and align.
Milliken Station
The station is 90-95% complete to the point the east platform is ready for service. Once the east platform is in service, track for the west platform can be gravel and align as well installing all the screens on the platform.
Taller fencing has been installed on the rear of both platform with no access to the east or west platform other than the new Steeles entrances or the station parking lot.
Work is still underway getting the Steeles stairs and elevators into service as well the walkway bridges over Steeles.
Both stations parking lots were nearly full where it not block off for construction work or material. A huge jump from the last time I had a looked at the stations this year.
Kennedy Station
This station is only 50% complete considering service was moved to the east platform on April 8 with the the east needing most of the work done on it. The west platform stills needs work like it has needed the last 2 years to complete it.
Trains locomotive stop on the north side of Eglinton overpass that is next to the Crosstown Station entrance. Lots of work to be done for that entrance with the saying Q1 2024 opening date.
Bike rack storage is at the north end under the overpass.
The only elevator out of the 3 location that has a partly built one in it is at the south end of the east platform. There are 2 ramps to the east platform where the elevators are to be, Small crew on site and most of the work must be done overnight and weekend.
Photos to follow at a later date