Steve X
Senior Member
Hey, they might run faster trains if they did so.Part of that was because when the TTC wanted to do it, the contractor building the line was refusing access to the TTC because they were trying to sue Metrolinks, so they could pick an operator instead of having the TTC be named it by Metrolinks
Hold on a minute, did they forget who owns the line? Do these pesky garbage contractors actually think they can hold the public ransom?




