April 27
Have a looked at Line 6 today and what a mess.
There is a sign on line 6 saying elevators are out of service for a few moths either a Finch or Yonge Station. I thought I took a photo of it but end up not doing it.
Next train say one thing and the LRV shows up sooner or later that posted arrival. Saw as much as 15 minutes for the next eastbound and 5 minutes later it shows up.
Traffic lights the same as Line 5 with left turning taking place last.
Speed is still slow especially between Kipling and Islington as a few ran near the speed limit well the rest in the 40's for a 60 zone. Did clock one and it did 55 but mostly over 50 going east.
Bike lanes are still not open to the point traffic was using it to get around road construction. Sidewalks and corners being rebuilt as they were done poorly.
Shooting off the walkway, I watch 4 pickups at various time park on the bike lane that were single drivers. One left anther arrive to take its spot. They finally got out and started talking and I had no clue what was taking place. A few minutes later another pickup stop under the walkway and started to close the inside lane with pillions and a sign shift to the right. As I was leaving, a six pickup pull up and they all walk over to the walkway. Someone pointed to either the walkway or the overhead and did not hang around as I was running latte
I did notices all the LRV's have their numbers on the roof in two spots that are very large and do not recall seeing this in the past.
As I noted, some road work taking place in various spots as well curb work and nothing done for the CPKC bridge.
After I left the :LRV that I was clocking, the next vehicle was all over the place from 6 minutes and down to two at Norfinch and no sign of it in my rear view and hitting green light at 5 over the limit since rest of the traffic was doing it and more.