A
adma
Guest
Maybe some of those grimier 50s walkups can be renamed "Shaved" or "Plumpers"...
update by Jasonzed over at SSC....work continues on Elle, Amacon's 3rd tower in Mississauga....
i think this would technically be Amacon's 4th tower in mississauga. their first was at Dixie and Rathburn - along with the townhouses there.
Going by the site to day, there was a 500ton crane been setup and that's not a good sight in a snowstorm.
If the crane is been setup to take the ELLE tower crane down, it does not fair well Amacon City project.
It could be for taking a piece of equipment.
I know Amacon has had a tought time sell unites in the other 2 towers with Eve still looking for buyers.
The last time I looked in the hole, they still had 3 more garage levels to do before hitting grade.