News   Nov 14, 2024
 756     0 
News   Nov 14, 2024
 1.1K     0 
News   Nov 14, 2024
 487     0 

Dupont Station accessibility project (TTC)

The failure to include some measure of redundancy, at the very least with major stations, is an unfortunate failing with the Easier Access project.

Of course, the various components should work better, and more often than they do; but it's a fact of life that all would require shutdowns for maintenance and refits at various times, which is why having a second elevator path from
platform to surface matters.
Yeah, this is something that really could have been done better. For its many flaws, one thing Ottawa's Confederation Line has done well is the inclusion of redundant elevators.

Good news for Toronto is that Metrolinx looks to be doing the same for the Ontario Line and SSE extension (based on the renderings we have showing multiple elevators on a consistent basis).

That said, we need to do better with improving accessible access to the stations we already have. It's ridiculous we're building an entirely new entrance to College station, for example, and only including a single accessible route to the surface as part of it.
 
The artwork on those new-ish cinder block walls...


20240115_221207.jpg
20240115_221214.jpg
 
Are those cinder-block walls the final state? If so ....

Couldn't find any details online on whether that's the final state they intended. Guess it's only fitting for Dupont station to be left in a state of aesthetical uncertainty, to capture the incompleteness of the place for the greater part of the last decade or so.
 

Back
Top