News   Apr 26, 2024
 1.8K     4 
News   Apr 26, 2024
 399     0 
News   Apr 26, 2024
 994     1 

Danforth Line 2 Scarborough Subway Extension

Can someone tell me why, unlike every other map maker in the world, Metrolinx doesn't put their maps so that North is at the top?

Their image in the post above has North to the right, just for kicks.
Must know something we don't know. A polar shift coming?

Map-Earth%27s-northern-polar-region-geomagnetic-North-Pole-since-1900.jpg

From link.
 
Can someone tell me why, unlike every other map maker in the world, Metrolinx doesn't put their maps so that North is at the top?

Their image in the post above has North to the right, just for kicks.
Probably just so the map didn't take up too much room on the site. On the engage site they have both north-south oriented maps as well as this more east-west one. Seems they just use whichever one first with the article or page best layout-wise.
 
Once again Scarborough gets the shaft.

But at least the transit geek crowd on the street will cheer as the TBM gets lowered into the holes.
 
If they don't upgrade Line 2 with ATC and with new trains in time for the opening they could at least have the extension only have new trains and ATC and have the new trains short turn back northbound at Kennedy so one would have to transfer at Kennedy to go further north, or south.

:D
 
If they don't upgrade Line 2 with ATC and with new trains in time for the opening they could at least have the extension only have new trains and ATC and have the new trains short turn back northbound at Kennedy so one would have to transfer at Kennedy to go further north, or south.

:D

Well, if absurdity is the new goal, then they can as well split the existing subway services into multiple short segments, and introduce transfers at every segment boundary. For example, a Line 2 trip from Kipling to Yonge would include a transfer at Jane, then another transfer at Dundas, and one more transfer at Dufferin.

A small efficiency gain in the trainset usage may be expected, as the outer segments can manage with less frequent service than the central segments.
 

Back
Top