vic
Senior Member
Also interesting is that the map inside the bus shelter is a TTC map.Interesting that the bus stop is marked TTC when this is a miway only stop. The 50 turns in the loop just east of Mill.
Also interesting is that the map inside the bus shelter is a TTC map.Interesting that the bus stop is marked TTC when this is a miway only stop. The 50 turns in the loop just east of Mill.
@Northern Light The Eglinton TOday page has been updated with some stakeholder meeting group summaries that include project updates. In the January update there is a grainy presentation slide with an updated map. It appears to show the four lane cross section extended east from Bathurst to Spadina and configuration B replacing configuration D between Oakwood to Times Road. On page 2 there is a reference to the cycle tracks being protected by only bollards and *not* curbs.
Also this from the March stakeholder consultation stood out to me:
"The project team is working hard to align the complete street installation as closely as possible with the opening of the ECLRT."
View attachment 551294
Je suis dans le ward de Matlow! I confess! Pourquoi?Now, does anyone here wish to confess to living in either of Councillor Saxe's ward or Councillor Matlow's?
honestly they should just build a bi-directional cycle track with a 4 meter width. It would be a better use of the limited space, as you could consolidate the buffers space into one.@Northern Light The Eglinton TOday page has been updated with some stakeholder meeting group summaries that include project updates. In the January update there is a grainy presentation slide with an updated map. It appears to show the four lane cross section extended east from Bathurst to Spadina and configuration B replacing configuration D between Oakwood to Times Road. On page 2 there is a reference to the cycle tracks being protected by only bollards and *not* curbs.
Also this from the March stakeholder consultation stood out to me:
"The project team is working hard to align the complete street installation as closely as possible with the opening of the ECLRT."
View attachment 551294
Bollards with no curbs? More like bollocks.I have confirmed there are no material changes to this project.
All bike lanes/cycle tracks will have separation, but curbs appear only where there is no parking; where there is parking, you get the bollards.
While I was happy at first, I think this is a sign that the city has given up on this last portion of the trail between Marlee and the Allenway.
View attachment 551075
Why build a fully separated bike lane all along Roselawn from the Allen Greenway to Marlee if youre going to use the part labelled "Future York Beltline trail connection"
Seems to me like they aren't going to use it and are just not saying so to not get any negative feedback until this work is done
Summoning @Northern Light for this one... Out of curiosity, has the idea of an East Rail Trail ever been explored? Looking at the map, it seems like the section of the Lakeshore East line between the Danforth and East Point Park would offer a real benefit. It would connect the Danforth bike lanes to the Highland Creek and Waterfront trails and with access to 3 GO Stations along the way. It also seems like there would be sufficient space to put a trail along the majority of the route with maybe the exception of the stretch from Birchmount to Kennedy.
You rang?
I don't believe the rail corridor has been considered for a trail here. However, the lands of the former Scarborough Transportation Corridor (the lands acquired to build the Scarborough Expressway have been, in spots). The STC lands generally parallel the rails.
Trail is in in place from Brimley to Bellamy:
View attachment 553056
I know the City looked at some of the following section below, not sure if it was the whole thing:
View attachment 553057
This was over 10 years ago now, at the time, the homeowners threw an unholy fit at the thought of a bike trail behind their homes, all sorts of nonsense about attracting ne'er do wells.
The corridor was sold off near Midland, and is pinched there as a result. (short sighted)
East of Guildwood, alot of the land is there, but the homes on Portia street might be a problem. Dow Chemical might be as well.
There is no space west of Kennedy to west of Warden:
View attachment 553058
Warden to VP the apparent space to the north, a few properties excepted is reserved to the 4th track project for GO Transit.
The land to the south is being developed.
West of Victoria Park there is room for a segment to Dawes Road, but that's about it.
****
To me, the high priority would be the Markham to Kingston Road segment. Its been looked at before and is viable. Most of the rest is challenging and/or pretty short.
To continue this, a report/study/request by the city went out 5-8 years ago about adding rail trails along MX owned rails, and they basically politely said to F*$% off. They said its not possible, without any sort of reasoning.
I can't find this report of course now.