Mike in TO
Senior Member
Couldn't find a thread for this anywhere...
The City approved the application for a mixed-use development at 99 Blue Jays way on May 25th. The appeal period for the OMB is up to June 28th.
The maximum permited height is 63.75 meters including the rooftop mechanical equipment. The built form envelope includes a 22.1m podium on the west side of the site and a 16.1m high podium on the east end of the site.
The City approved the application for a mixed-use development at 99 Blue Jays way on May 25th. The appeal period for the OMB is up to June 28th.
The maximum permited height is 63.75 meters including the rooftop mechanical equipment. The built form envelope includes a 22.1m podium on the west side of the site and a 16.1m high podium on the east end of the site.