Toronto1834
Active Member
Can't speak for the inside, but the last time I went by the outside within the last few weeks it looked 80%- 90% complete. Some of the glass still needs to be installed at the corner and the subway entrance isn't complete.
Not done yet. Set to open this springIs this done now? How done is this now?
42
This looks so tacked on.
This looks so tacked on. Pretty terrible IMO.
Plus the windows should have the same coating on them…It basically shares no materiality or patterning similar to the original building. I sort of wish the part with the tan tiles had also been made black like the rest of the addition.




