G
Greg29Toronto
Guest
Only a couple of levels left. Precast is going up on the east side of the building and windows are going in on the south side of the 2nd floor



|
|
| |||||||||||||||||||||
|
It does look good to me. Compare to the horrendous precast on the Met.