News   Apr 17, 2026
 702     0 
News   Apr 17, 2026
 1.5K     6 
News   Apr 17, 2026
 663     0 

Search results

  1. 2

    Highway 401 Transit and Auto Tunnel

    That’s a bit of a blanket statement. It depends what you want to solve. Adding capacity through Toronto is functionally useless as there is nowhere for it to go, there’s no room for expansion on city streets. Expanding the 401 out towards Waterloo Region and Kingston is a better goal, for...
  2. 2

    Highway 401 Transit and Auto Tunnel

    Agreed. And actually yes, the 401 (Toronto Bypass) was actually was 2 lanes in each direction until they expanded it to the 12 lanes we have today.
  3. 2

    Highway 401 Transit and Auto Tunnel

    What’s your alternative? Would you rather we go back to the original 401 before its expansion, which was only 2 lanes each way? I do agree that 12 lanes is usually a bit much and we should have built Toronto differently, and with better planning, but it’s what we have today.
  4. 2

    Highway 401 Transit and Auto Tunnel

    After a certain point it becomes unrealistic or unreasonable to keep expanding. Aside from the frivolous 401 tunnel proposal, there really isn’t much to realistically do to the 401 across Toronto proper except maybe some lane reconfigurations. The 400 will be fully built out in the coming years...
  5. 2

    Highway 401 Transit and Auto Tunnel

    12 lanes moving at 40km/h is still more people than 6 lanes at the same speed. Not that we should endlessly expand highways, but don't we want more people taking trips? That improves people's mobility. Obviously if we can make those trips on transit it is superior, but freeways will always be...
  6. 2

    Highway 401 Transit and Auto Tunnel

    It's not necessarily about speed per se, it is about redirecting through traffic from local roads and Downtown Bradford where it doesn't need to be. This is the model we should be aiming for- through roads for cars should be separate from valuable space in our cities. It's why the Netherlands...
  7. 2

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Hate to be the pessimistic one, but when do we start worrying about 2026?
  8. 2

    Richmond Hill Yonge Line 1 North Subway Extension | Metrolinx

    I think the question was more about the radius of the curve. To me at least, it does not seem different enough to matter significantly.
  9. 2

    Finch West Line 6 LRT

    https://www.cp24.com/local/toronto/2025/12/26/no-service-on-much-of-line-6-due-to-debris-on-tracks/
  10. 2

    Roads: Ontario/GTA Highways Discussion

    Most of the curves are fine to be honest, the curve down the hill right as you come into Kingston is substandard though.
  11. 2

    Roads: Ontario/GTA Highways Discussion

    I'm very much aware of what induced demand is and I am an avid consumer of urbanist content. I actually walk, cycle (yes, in the winter too), and use public transit more than I drive. As insertnamehere explained really well, it's not necessarily a bad thing. The Netherlands has some roads that...
  12. 2

    Roads: Ontario/GTA Highways Discussion

    Let's actually just reduce all 400 series highways to 2 lanes. Surely demand will evaporate into thin air, right?
  13. 2

    Finch West Line 6 LRT

    Let's just hand Line 6 over to GRT at this point
  14. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    Realistically I don't think we'll ever see the 427 extended in our lifetimes. The 400 would sooner be 10 laned to Barrie before that is even considered.
  15. 2

    Finch West Line 6 LRT

    Likely it will get to a point where it is just the line map of the train you are on, like the ones we see on Line 6 trains. And then, a regional diagram (Metrolinx's is actually very good) could be posted somewhere else along the train.
  16. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    - Increased connectivity and redundancy in the highway network that allows more travel routes. Spreading out traffic over multiple routes will always work better than funneling them into one, think why the 401 is so bad. If there is an accident or severe weather impacting the 400, the entire...
  17. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    Ok then, let's cancel the Northlander too while we're at it. Apparently there's nothing up there but cottages. And wait till you hear this- people actually live in Bradford and northern York Region that regularly go to Toronto!
  18. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    Listen, it's pointless to argue this now. That ship sailed long ago. It's happening.
  19. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    I don't see much of a benefit, and I doubt the MTO wants to build a full interchange for that so it would end up being half assed regardless. 88 and 89 will do the job fine for those movements, and besides, 27 really isn't that important of a road anymore unless there are closures on the 400, in...
  20. 2

    Bradford Bypass (MTO, Hwy 400 - Hwy 404)

    I've never heard of such a rule, do you know any documents that reference it? In that case, 419 could still work (it is the next unused odd number other than 411)

Back
Top