  1. C

    Alto - High Speed Rail (Toronto-Quebec City)

    Martin Imbleau writes for the Star. https://www.thestar.com/opinion/contributors/if-canada-wants-to-lead-it-has-catch-up-first-that-means-building-alto-high-speed-rail/article_dfe8914e-b346-4d7a-b817-a813c1287b01.html
  2. C

    Alto - High Speed Rail (Toronto-Quebec City)

    This website mentions 40-60m for the railway RoW and might not include the service road. Also these numbers might be more illustrative and not technical. https://en.consultation.altotrain.ca/the-alto-high-speed-rail-network-designed-for-performance-with-safety-in-mind
  3. C

    GTHA Transit Fare Integration

    https://www.ctvnews.ca/toronto/article/gtha-transit-unions-call-on-ford-government-to-halt-expansion-of-fare-integration-program/ Some excerpts Local transit unions in the Greater Toronto and Hamilton Area are calling on the Doug Ford government not to push forward with its plan to harmonize...
  4. C

    Roads: Traffic Signals

    For context, some of the costs.
  5. C

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    CP24: "The TTC says the line is closing earlier Saturdays because of an extended maintenance window requested by Metrolinx and Crosslinx" That's a 7 hour extended maintenance window compared to 4 hours on other days. (Note the actual maintenance window may be shorter)
  6. C

    Alto - High Speed Rail (Toronto-Quebec City)

    "GO 2.0: Canada and Ontario will explore options that will allow increased GO Transit passenger service along freight-owned corridors across the Greater Golden Horseshoe region, including improved service along existing GO lines and the potential creation of new GO lines in the Greater Golden...
  7. C

    GO 2.0 Expansion Plan

    "GO 2.0: Canada and Ontario will explore options that will allow increased GO Transit passenger service along freight-owned corridors across the Greater Golden Horseshoe region, including improved service along existing GO lines and the potential creation of new GO lines in the Greater Golden...
  8. C

    GO Transit: Service thread (including extensions)

    https://www.thetrillium.ca/news/municipalities-transit-and-infrastructure/metrolinx-could-run-first-electric-go-trains-in-2036-leaked-document-12002512 The Trillium was able to obtain a February draft of Metrolinx's internal fleet strategy. The Go train fleet is in "poor" condition. The poor...
  9. C

    TTC: Other Items (catch all)

    It's not hypocritical to ban cars while allowing diesel buses. It's still green, and there are benefits for having a park without cars.
  10. C

    Toronto Bike Share

    From X user Observing the city. Overlooked this in the report. These stats are quite impressive for Centre Island. Able to drive 9% of revenue from 1% of rides. Also 43% of day passes and 33% of new users.
  11. C

    Toronto Bike Share

    A phone mount would be a massive improvement. Interested to see what Phase 1 of the Toronto Bike Angels Program will look like in 2027. They're also Presto/One-fare business case review and finalization by Q2 2026.
  12. C

    Toronto Ontario Line 3 | Metrolinx

    That seems like a broad generic answer on where the fill might go? They just don't have an idea yet and will see who needs it? Meanwhile, Doug Ford is saying today about infilling part of Lake Ontario for a new convention centre at Exhibition. "I wouldn't call it an island but we may look at...
  13. C

    TTC: Other Items (catch all)

    Video on the removal of Tunnel Fireproofing containing Abestos at North York Centre Station [5 min].
  14. C

    Toronto Ontario Line 3 | Metrolinx

    Sounds like the perfect place to build short townhomes. 😄
  15. C

    Metrolinx: Other Items (catch all)

    Tracking Metrolinx Project Costs Metrolinx baseline and cost incurred are fun statistics but a historical tracking isn't accessible. Steve Munro provides that over the past 7 years for GO, Smart Track, LRT, Subway, and Bus projects...
  16. C

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Though the YT video doesn't really make the claim. Maybe @SaugeenJunction was mistaken or making a joke. The YT video had a generic title 'Eglinton Crosstown LRT' and no comments. From googling I just see the claim on social media posts from beyondfinch, on Reddit and Instagram, a 13s clip and...
  17. C

    GO Transit Electrification | Metrolinx

    Currently we have hourly off-peak to Mount Joy. First milestone 2 hour off peak to Stouffville. [60 min off peak to Mt Joy] Second Milestone 60 min off peak to Stouffville. [60 min off peak to Mt Joy] Third Milestone. 30 min off peak to Mt Joy and 120 min off peak to Old Elm. [60 min off peak...
  18. C

    2026 Ontario Liberal Leadership Race

    It's a long runway, and there'll be drama with the Scarborough Southwest By-election.
  19. C

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    @duty free It's funny because I always though Sheppard was supposed to be part of the last batch but they've been really slow walking it.
  20. C

    PM Mark Carney's Canada

    https://www.theglobeandmail.com/politics/article-infrastructure-minister-confirms-cut-canada-public-transit-fund/ The Infrastructure Minister has confirmed that the $30B Public Transit Fund will be cut to $25B. I think this is a positive as there was some initial confusion whether the Public...