News   Apr 23, 2024
 1.5K     5 
News   Apr 23, 2024
 521     0 
News   Apr 23, 2024
 1.2K     0 

Search results

  1. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    The tower is designed to resist loads through its mega columns and shear walls that are designed for the use of rebar. Filling out the concrete with as much reinforcement as possible is essential as this is the main source handling the tower’s load. Also the tower is designed to limit stress on...
  2. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Yesterday from the steel kingdom.
  3. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior walls continue to fill up with rebar and formwork preparing for an upcoming 1000 cubic meter concrete pour.
  4. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Another week of progress at The One
  5. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Very excited to see how the diagonals are going to be placed.
  6. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior walls continuing to be filled with rebar. Elevator shafts for the main tower have also started to arrive on site today:
  7. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    @jibsta It gives better access to the 5th floor transfer, which is at a higher elevation than the 5th floor of the south podium where the slope starts.
  8. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Thanks for that nugget. Gotta get me some gelato. 👍
  9. A

    Toronto 383 Sherbourne | 129.04m | 39s | NJS Capital | Arcadis

    Design is lazy. A few sharp features, but even those are downplayed. Less building coverage for the front exterior of the tower would look much better imo.
  10. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior wall structure for main tower from level 5 transfer up to level 6 taking shape today:
  11. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Could possibly be latch sockets for further shoring. cheers
  12. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Not sure about the red nubby things, but the yellow poles are indeed temporarily there to support the slab until columns are placed where the rebar is above on the slab.
  13. A

    Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    A pump crane has been installed on the 6 story south bank that has been used to pour to this point. Not sure if it will be serviceable beyond that height though. Theoretically the pump tower could either be extended or potentially transferred into a new tower in or around the main portion of the...

Back
Top