    Cycling infrastructure (Separated bike lanes)

    Received this in the mail the other day but forgot to share it then, thought I would still share it in case anybody was interested -
  2. S

    Downtown Markham

    Downtown Markham Retail Update To start off, lets look at the latest list of retail and office locations in the 3 main complexs of Downtown Markham. Here is a few photos of Downtown Markham, and it's current retail landscapes: Above is a picture of the Nexus building. We can see a convenience...
  3. S

    Markham Gallery Square | ?m | 16s | Remington Group | BDP Quadrangle

    Via the Gallery Square brochure, which can be found here, https://downtownmarkham.ca/gallery-square/ , you can find more renders, statistics, and there's a few that stood out to me. First off, the retail floor plan: There is then these two renderings of the Market Hall, which was presumably...
  4. S

    Markham UnionCity | 147.7m | 44s | Metropia | Arcadis

    Update - They have created a asphalt sidewalk on the north side of Enterprise Blvd.
  5. S

    Markham Amica at Unionville | 34.56m | 9s | Rockport Group | CMV

    Where exactly south? If it's south of Phase One (The west phase, which is the one not currently under construction), it is most likely some sort of prep for 28 Main Street (https://urbantoronto.ca/database/projects/28-main-street.47430). If it's the corner of Main Street Unionville and...
  6. S

    Markham UnionCity | 147.7m | 44s | Metropia | Arcadis

    They are indeed building infrastructure, most likely a water main and other needed utility. There is a massive hole in the middle of the road as well as a large hole in the berm just southwest of the railroad tracks.The south 2 lanes between University Blvd and Sciberras Rd has been closed...
  7. S

    Markham Gallery Towers | 102.51m | 30s | Remington Group | BDP Quadrangle

    There is brick starting to be laid for the podium, but it is unclear if the same brick/if brick at all will make it all the way up. There are several different renders; some with brick going all the way up, some with brick only for the podium, and the brick colour also varied, such as black...
  8. S

    Markham Gallery Square | ?m | 16s | Remington Group | BDP Quadrangle

    Today. There is curved glass on the south and north corners of the podiums fronting Birchmount.
  9. S

    Markham York University: Markham Centre Campus | 56.08m | 13s | York University | Diamond Schmitt

    You seem to be correct, according to a Minor Variance Application submitted to the City of Markham. Here is the link for further documents, including a site plan. https://www.arcgis.com/apps/dashboards/87a7bce386d54a86b66fcad46bac13bd#ID=1507810
  10. S

    GO Transit: Construction Projects (Metrolinx, various)

    All pedestrian walkways, including the bridge over Steeles Avenue at Milliken GO Station are now open.
  11. S

    Markham Gallery Square | ?m | 16s | Remington Group | BDP Quadrangle

    CONSTRUCTION UPDATE: GALLERY SQUARE "We are pleased to report that construction at Gallery Square is moving efficiently. Our hardworking and diligent construction team continues to work on all three towers ensuring our timelines are being met. Currently in Tower “A” and “B” all exterior...