News   Dec 05, 2025
 1K     5 
News   Dec 05, 2025
 3.3K     7 
News   Dec 05, 2025
 623     0 

Search results

  1. A

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    They can definitely open segments of the path, but given the progress on RailPath, I’m not confident they’ll finish it before 2030.
  2. A

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Metrolinx has posted two construction notices for greenway project https://assets.metrolinx.com/image/upload/v1760648258/Documents/Metrolinx/Davenport_Diamond_Greenway_-_Pedestrian_Bridge_-_October_2025_-_FINAL2_1.pdf They seem to be doing an exhibition too...
  3. A

    Cycling infrastructure (Separated bike lanes)

    I got a reply back from Mayor Chow about Eglinton Complete Street
  4. A

    Toronto Parliament Slip | ?m | ?s | Waterfront Toronto | West 8

    Reminds me of Oslo which has quite a lot of these floating sauna's Wonder what it will take for Toronto to have some too
  5. A

    Cycling infrastructure (Separated bike lanes)

    I got this in the Mail Installation of Bike lanes on Emerson Avenue https://www.toronto.ca/wp-content/uploads/2025/07/8e9a-Wallace-Emerson-NSP-Installation-NoticeAODA.pdf
  6. A

    Toronto GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    I reached out to the Councillor’s office (Davenport) asking about updates on the project and here is what I heard from them
  7. A

    Toronto Galleria III | 112.4m | 31s | Almadev | Hariri Pontarini

    Curious to know what kind of vlogs do Japanese Tourist make about Geary 🍭
  8. A

    Liberty Village pedestrian link

    Looks like we have an opening date
  9. A

    Liberty Village pedestrian link

    According to someone on Facebook, the bridge will open in Spring

Back
Top