It seems like for either alignment, the Longwood Bridge, the Main over CP bridge (EOL) and the highway ramps (2-way conversion) need to be reconstructed.
With the redesign, Metrolinx is trading off building a longer LRT-only bridge in favour of re-building the shorter Main over 403 bridge for...